Ashby Boat Company Limited, Canal Wharf, Stoke Golding, Warwickshire, CV13 6EY | 01455 212671 | sales@ashbyboats.com

Measham Outfitting – 21st. November – Putting the ballast into the bottom of the shell

Pictures of the inside of the hull after the “bottom” and the strengthening cross members had been “waxoyled” prior to placing the “ballast”.

Note: If you are thinking of ballasting a boat with bricks in a similar manner they MUST be engineering quality bricks.